|
Ceiling
tiles
Replaced
900 sq. ft. ceiling tile throughout the barge.
Barge
systems and equipment
Deep
cleaned and disinfected interior barge and its entirety, provided temporary
services to operationally test and inspect the general announcing systems,
telephone systems, alarm switch boards, fire and flooding alarms, electrical,
lighting, CHT and associated tanks, laundry equipment, ventilation, heating,
air conditioning, refrigeration plants, potable water, hotel steam, fire
stations, pumps, deck drains, water coolers, fire extinguishers, flush meters,
faucets, gauges, doors, hatches, and insured all systems were fully operable
prior to ships’ crew move aboard.
|